www.2cas.cn-青苹果乐园,国产精品国产三级国产专不?,久久人妻夜夜做天天爽,中文字幕欧美中日韩精品

      • <strike id="amgce"></strike>
      • <ul id="amgce"><sup id="amgce"></sup></ul>
        <strike id="amgce"><input id="amgce"></input></strike>
        <strike id="amgce"><menu id="amgce"></menu></strike>

          Contact UsMore>>

          Jiangsu Tianli Steel Structure Co., Ltd.

          General Manager: Mr. Zhu Hongjun

          Phone: 0511-88135999

          Contact: Mr. Chen Helin

          Phone: 0511-88131777

          Mobile: 13952238816

          Fax: 0511-88131118


          News

          Let you know how to install the lightning tower?

          Author:admin Time:2018-11-12 10:41:00
          If you bought the lightning tower, you can ask the manufacturer to teach you. If it's cheap for you, you can refer to the national standard atlas. The lightning tower generally saves 300 kg by two, 600 kg by three, 870 kg by four and 1200 kg by five. In general, the equipment of lightning tower is hoisted by trucks and cranes from foundation construction to vertical tower, which can save labor and time and speed up the progress of the project. But this can only be done in a place where the environment is better, where both the truck and the crane can enter the facility. In practice, many cases, such as mountainous areas and places with poor environment, can not use the construction of lifting vehicles and cranes.
          The following is how to finish the artificial equipment of lightning tower.
          Personnel arrangement:
          1. Foundation construction: 1 person for concrete mixing and pouring, 4 for manual work.
          2. Artificial equipment: one crane worker, two shelf worker and five manual worker.
          3. On-the-spot processing: skill handling for one person. 2. Construction: 1. Foundation construction: two single-wheel or two-wheel concrete trucks, six shovels, two picks, one hammer and one iron braze. 2. Artificial equipment: two hand-plank hoists, one three-minute wire rope 30-60 meters (matched with hand-plank hoist), two fixed pulleys per ton, two steel wire suspension rope locks, five six-minute ropes (40 meters each), two pine poles 4-6 meters (_8-18 cm monotonous and not stale), and a number of No. 8 wire.
          Two. Construction
          1. Foundation construction: In general, the base of lightning tower is described according to the number of lightning tower nodes, and the embedded parts and the depth of the foundation are described. Then, according to the practical situation on the spot, appropriate things and workers are selected to carry out the foundation construction. The curing period of concrete is more than one week.
          2. Artificial equipment: equipment that can be used for lightning tower after concrete curing period. Firstly, the supporting lightning tower suitable for foundation buried parts is manually transported to the foundation site, and the construction of artificial equipment is arranged by professionals.
          3. Manual equipment method (holding pole method)
          1. Prepare and fix the holding pole: Fix a ton of fixed pulley with No. 8 wire to the top of the pine pole 4-6 meters (holding pole), then put the hand board hoist suspension rope through the fixed pulley, and tie three pulling ropes to the top of the holding pole for the vertical of the holding pole. The hanger fixes the holding pole vertically at the base of the tower for the manual lifting of the first lightning tower.
          2. Lifting construction arrangement: In the first section, the lightning tower is lifted manually. The lifting rope and hand plate hoist are fixed by the crane worker, and three people (manual worker) are arranged to manage the three pulling ropes to stick to the vertical of the holding pole. Two people (manual worker) are also required to bolt the lifting rope to the lifting part of the first lightning tower for hoisting, and one pulling rope is used to hoist the lightning tower. Line-to-line alignment of lightning tower. At this time, the first lightning tower can be lifted manually by crane control hand-plate hoist. When the first lightning tower is vertical, the lightning tower and the foundation can be buried by adjusting force. After checking, the lightning tower can be fixed with ready bolts immediately. At this time, the first lightning tower equipment is completed. Artificial lifting of the second, third, fourth and fifth sections of lightning tower is different from that of the first section, which is the fixing of the holding pole. It fixes the holding pole on the top of the first section of lightning tower with No. 8 wire, and then the other methods are the same. However, due to the high altitude operation, the personnel of the docking lightning tower are replaced by the erectors.
          日韩av无码一区二区三区不卡| 国产成人无码精品久久二区三区| 2023国产精品最新在线| 碰97精品视频在线观看| 一区二区三区国产好的精华液| 97人人模人人爽人人少妇| 久久精品国产亚洲AV无码偷窥| 中文字幕av高清有码| GOGOGO高清在线播放免费观看| 国产精品美女久久久九九九|