www.2cas.cn-青苹果乐园,国产精品国产三级国产专不?,久久人妻夜夜做天天爽,中文字幕欧美中日韩精品

      • <strike id="amgce"></strike>
      • <ul id="amgce"><sup id="amgce"></sup></ul>
        <strike id="amgce"><input id="amgce"></input></strike>
        <strike id="amgce"><menu id="amgce"></menu></strike>

          Contact UsMore>>

          Jiangsu Tianli Steel Structure Co., Ltd.

          General Manager: Mr. Zhu Hongjun

          Phone: 0511-88135999

          Contact: Mr. Chen Helin

          Phone: 0511-88131777

          Mobile: 13952238816

          Fax: 0511-88131118


          News

          Requirements for Installation of Process Towers

          Author:admin Time:2018-11-12 10:04:00
          The installation of process towers must meet the following requirements:
          (1) The design documents of the process tower have passed the conference;
          (2) The foundation has been checked and accepted;
          (3) Complete components with pre-assembly records;
          (4) The construction equipment is complete, and engineers and field operators are in place.
          (5) Before installation of the process tower, the supervisor must examine and approve the construction organization design or construction scheme and safety measures of the contractor. If a scheme does not meet the requirements, it must be ordered to redesign or modify it.
          免费视频网站| 亚洲无码视频免费在线观看网址| 午夜在线欧美曰韩精品影视| 免费无码一区二区三区视频| 国产人成午夜免免费观看| 久久久91精品国产一区二区三区| 樱花动漫官方网站| 原来神马电影网最新电视剧| 91尤物无码专区免费播放| 一区二区人妻专区|